It was a Productive day for the combined efforts of the FCNEMBA trail crew and the local freeriders (a.k.a. the Pequonnock Valley Trail Care team).
(1) Two berms were built on the red trail and (2) the jump further up the trail was built out and the rough rooty trail tread below it smoothed out. 25 to 30 folks showed up to help and the weather was cool and cooperative!
starting the new berm
stripping down the lower berm to beef it up with rocks
the uphill jump was subsequently built up with massive rock work
moving monster rocks
progress on the new (main) berm
progress on beefing up the lower berm
our best friend Mick the beer man rode in with a cooler full of beer!
tasty and tantalizing (ooo naught nurse!)
The culmination of the trail session was seeing "lightening James" do the test run!
No comments:
Post a Comment